Attention A T users. To access the menus on this page please perform the following steps. 1. Please switch auto forms mode to off. 2. Hit enter to expand a main menu option (Health, Benefits, etc). 3. To enter and activate the submenu links, hit the down arrow. You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.
Attention A T users. To access the combo box on this page please perform the following steps. 1. Press the alt key and then the down arrow. 2. Use the up and down arrows to navigate this combo box. 3. Press enter on the item you wish to view. This will take you to the page listed.
Graphic for the Veterans Crisis Line. It reads Veterans Cris Lins 1 800 273 8255 press 1
My healthevet badge
 

Office of Construction & Facilities Management

Master Construction Specifications (PG-18-1)

 

Technical Information Library (TIL) - The source for VA's electronic Design and Construction Information
  TIL Feedback - we welcome your suggestions at til@va.gov

More than 300 Master Construction Specifications in MasterFormat 2004 (MF04) are maintained for VA construction projects in dual English/metric units.  All new projects and those in later design phases should use the MF04 specifications; please contact us for clarification.  (Information on MF95 sections.)

For VA National Cemetery Administration projects, please use the NCA Master Construction Specifications located at
http://www.cfm.va.gov/til/ncaSpec.asp.

 

All specifications are in Microsoft Word unless otherwise indicated.
All sections have dual Metric/English units.
  Download all sections in compressed file (>15MB).

Division 00 - Special Sections
NumberTitleChange Summary
00 01 10 Table of Contents  
00 01 15 List of Drawing Sheets 2015-07
00 11 21 Request For Proposal to Design Build  
 

Division 01 - General Requirements
NumberTitleChange Summary
01 00 00 General Requirements 2015-06
01 32 16.01 Architectural and Engineering CPM Schedules  
01 32 16.13 Network Analysis Schedules 2013-12
01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) 2015-02
01 32 16.16 Network Analysis Schedules (Design-Build Only)  
01 32 16.17 Project Schedules (Small Projects - Design/Build)  
01 33 23 Shop Drawings, Product Data, and Samples 2015-07
01 35 26 Safety Requirements 2014-10
01 42 19 Reference Standards 2015-07
01 45 29 Testing Laboratory Services 2015-06
01 57 19 Temporary Environmental Controls  
01 58 16 Temporary Interior Signage 2015-07
01 74 19 Construction Waste Management 2013-09
01 81 11 Sustainable Design Requirements 2013-02
01 91 00 General Commissioning Requirements 2013-06
 

Division 02 - Existing Conditions
NumberTitleChange Summary
02 21 00 Site Surveys 2013-05
02 41 00 Demolition 2015-02
02 65 00 Underground Storage Tank Removal 2013-05
02 82 11 Traditional Asbestos Abatement 2015-04
02 82 13.13 Glovebag Asbestos Abatement 2015-04
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 2015-04
02 82 13.21 Asbestos Roofing Abatement 2015-04
02 82 13.31 Asbestos Transite Abatement 2015-04
02 82 13.41 Asbestos Abatement for Total Demolition Project 2015-04
02 83 33.13 Lead-Based Paint Removal and Disposal  
 

Division 03 - Concrete
NumberTitleChange Summary
03 23 00 Stressing Tendons  
03 30 00 Cast-in-Place Concrete 2014-10
03 30 53 (Short-Form) Cast-in-Place Concrete  
03 37 13 Shotcrete  
03 41 13 Precast Concrete Hollow Core Planks  
03 41 33 Precast Structural Pretension Concrete  
03 45 00 Precast Architectural Concrete 2015-05
03 51 13 Cementitious Wood Fiber Decks  
03 51 16 Gypsum Concrete Roof Decks  
03 52 00 Lightweight Concrete Roof Insulation 2015-05
03 55 11 Gypsum Concrete Floor Decks  
 

Division 04 - Masonry
NumberTitleChange Summary
04 05 13 Masonry Mortaring  
04 05 16 Masonry Grouting  
04 05 31 Masonry Tuck Pointing  
04 20 00 Unit Masonry 2015-02
04 72 00 Cast Stone Masonry 2015-02
 

Division 05 - Metals
NumberTitleChange Summary
05 12 00 Structural Steel Framing  
05 21 00 Steel Joist Framing  
05 31 00 Steel Decking  
05 36 00 Composite Metal Decking 2015-05
05 40 00 Cold-Formed Metal Framing  
05 50 00 Metal Fabrications 2014-07
05 51 00 Metal Stairs 2015-05
 

Division 06 - Wood and Plastic
NumberTitleChange Summary
06 10 00 Rough Carpentry 2015-05
06 16 63 Cementitious Sheathing  
06 20 00 Finish Carpentry 2013-06
 

Division 07 - Thermal and Moisture Protection
NumberTitleChange Summary
07 01 50.19 Preparation for Re-roofing  
07 08 00 Facility Exterior Closure Commissioning 2013-06
07 11 13 Bituminous Dampproofing  
07 12 00 Built-Up Bituminous Waterproofing  
07 13 00 Sheet Waterproofing 2013-04
07 13 52 Modified Bituminous Sheet Waterproofing  
07 14 21 Latex Mastic Deck Covering 2015-05
07 18 13 Pedestrian Traffic Coatings 2015-05
07 21 13 Thermal Insulation  
07 21 23 Loose-Fill Insulation  
07 22 00 Roof and Deck Insulation  
07 24 00 Exterior Insulation and Finish Systems  
07 27 26 Fluid-Applied Membrane Air Barriers, Vapor Permeable  
07 27 27 Fluid-Applied Membrane Air Barriers, Vapor Retarding  
07 31 13 Asphalt Shingles  
07 31 26 Slate Shingles  
07 31 29.13 Wood Shingles  
07 32 13 Clay Roof Tiles  
07 40 00 Roofing and Siding Panels 2015-05
07 51 00 Built-Up Bituminous Roofing 2014-07
07 51 00.11 Built-Up Bituminous Roofing, Hot-Applied 2013-05
07 51 00.13 Built-Up Bituminous Roofing, Cold-Applied 2013-07
07 52 16 SBS Modified Bituminous Membrane Roofing 2013-02
07 52 16.13 SBS Modified Bituminous Membrane Roofing, Cold-Applied 2013-06
07 53 23 EPDM Roofing  
07 54 16 Ethylene Interpolymer (Kee) Roofing 2015-05
07 54 19 Polyvinyl-Chloride Roofing  
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 2013-01
07 56 00 Fluid Applied Roofing 2015-05
07 57 13 Sprayed Polyurethane Foam Roofing 2015-05
07 60 00 Flashing and Sheet Metal 2014-07
07 61 16 Batten Seam Sheet Metal Roofing 2015-05
07 71 00 Roof Specialties 2015-05
07 72 00 Roof Accessories 2015-05
07 81 00 Applied Fireproofing 2015-05
07 84 00 Firestopping 2015-05
07 92 00 Joint Sealants 2015-05
07 95 13 Expansion Joint Cover Assemblies 2015-05
 

Division 08 - Doors and Windows
NumberTitleChange Summary
08 11 13 Hollow Metal Doors and Frames 2013-01
08 11 61 Detention Door Screens  
08 11 73 Sliding Metal Fire Doors  
08 14 00 Interior Wood Doors 2015-02
08 17 10 Integrated Door Assemblies  
08 31 13 Access Doors and Frames  
08 33 00 Coiling Doors and Grilles 2014-07
08 33 13 Coiling Counter Doors 2014-07
08 34 36 Darkroom Doors 2015-07
08 34 53 Security Doors and Frames 2015-05
08 34 59 Vault Doors and Day Gates 2014-07
08 35 13.13 Accordian Folding Doors 2015-05
08 36 13 Sectional Doors 2015-05
08 38 16 Flexible Traffic Doors  
08 41 13 Aluminum-Framed Entrances and Storefronts 2015-05
08 42 33 Revolving Door Entrances 2015-05
08 44 13 Glazed Aluminum Curtain Walls 2015-05
08 51 13 Aluminum Windows 2015-02
08 51 13.11 Side-Hinged Aluminum Windows 2013-10
08 51 23 Steel Windows  
08 51 69.11 Aluminum Storm Windows 2015-05
08 56 19 Pass Windows  
08 56 53 Blast Resistant Windows  
08 56 59 Service and Teller Window Units  
08 56 66 Detention Window Screens  
08 63 00 Metal-Framed Skylights 2015-05
08 71 00 Door Hardware 2015-02
08 71 13 Automatic Door Operators  
08 71 13.11 Low Energy Power Assist Door Operators 2013-12
08 80 00 Glazing 2015-05
08 90 00 Louvers and Vents 2015-05
 

Division 09 - Finishes
NumberTitleChange Summary
09 05 16 Subsurface Preparation for Floor Finishes 2015-02
09 06 00 Schedule for Finishes 2015-04
09 22 16 Non-Structural Metal Framing 2014-10
09 23 00 Gypsum Plastering 2015-05
09 24 00 Portland Cement Plastering 2015-05
09 26 00 Veneer Plastering 2015-05
09 29 00 Gypsum Board 2014-11
09 30 13 Ceramic/Porcelain Tiling 2015-05
09 51 00 Acoustical Ceilings 2013-12
09 54 23 Linear Metal Ceilings 2015-05
09 63 13 Brick Flooring  
09 63 40 Stone Flooring 2015-05
09 65 13 Resilient Base and Accessories  
09 65 16 Resilient Sheet Flooring 2013-07
09 65 19 Resilient Tile Flooring 2015-05
09 66 13 Portland Cement Terrazzo Flooring 2015-05
09 66 16 Terrazzo Floor Tile 2015-05
09 67 23.20 Resinous (Epoxy Base) With Vinyl Chip Broadcast (RES-2) 2014-07
09 67 23.30 Resinous (Epoxy Base) High Performance Decorative Mortar Flooring (RES-3) 2014-07
09 67 23.40 Resinous Poured in Place Resilient Flooring (RES-4) 2014-07
09 67 23.50 Resinous Terrazzo Flooring (RES-5) 2014-07
09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A, and RES-6B) 2014-07
09 68 00 Carpeting 2015-05
09 68 21 Athletic Carpeting 2015-05
09 69 00 Access Flooring 2015-05
09 72 16 Vinyl-Coated Fabric Wall Coverings 2015-05
09 72 31 Polypropylene Fabric Wall Covering 2015-05
09 84 33 Sound Absorbing Wall Units 2015-05
09 91 00 Painting 2015-05
09 94 19 Multicolor Interior Finishing 2013-05
09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 2014-07
 

Division 10 - Specialties
NumberTitleChange Summary
10 11 13 Chalkboards and Markerboards 2015-05
10 11 23 Tackboards 2015-05
10 13 00 Directories 2015-05
10 14 00 Signage 2015-05
10 21 13 Toilet Compartments  
10 21 16 Shower and Dressing Compartments  
10 21 23 Cubicle Curtain Tracks 2015-05
10 22 13 Wire Mesh Partitions 2015-05
10 22 19.13 Demountable Metal Partitions  
10 22 26.13 Accordion Folding Partitions 2015-05
10 25 13 Patient Bed Service Walls 2015-05
10 26 00 Wall and Door Protection 2015-05
10 28 00 Toilet, Bath, and Laundry Accessories  
10 44 13 Fire Extinguisher Cabinets 2014-08
10 75 00 Flagpoles  
 

Division 11 - Equipment
NumberTitleChange Summary
11 05 12 General Motor Requirements for Equipment  
11 12 00 Parking Control Equipment  
11 17 36 Package Transfer Units 2013-02
11 26 00 Unit Kitchens  
11 27 00 Photographic Processing Equipment  
11 40 11 Custom Fabricated Foodservice Equipment  
11 40 21 Food Service Equipment-Utility Distribution System  
11 41 00 Food Storage Equipment  
11 41 21 Walk-In Coolers and Freezers 2015-05
11 44 00 Food Cooking Equipment  
11 48 00 Cleaning and Disposal Equipment  
11 53 13 Laboratory Fume Hoods 2015-05
11 53 23 Laboratory Refrigerators  
11 53 53 Biological Safety Cabinets and Laminar Airflow Work Stations  
11 53 61 Custom Fabricated Laboratory Equipment  
11 53 71 Solution Warming Cabinets  
11 71 01 Medical Washing and Sterilizing Equipment  
11 71 02 Laboratory Washing and Sterilizing Equipment  
11 73 00 Ceiling Mounted Patient Lift System 2014-09
11 78 00 Mortuary Equipment  
11 78 13 Mortuary Refrigerators  
11 79 13 Hydrotherapy Equipment  
11 82 19 Packaged Incinerators  
 

Division 12 - Furnishings
NumberTitleChange Summary
12 22 16 Drapery Track and Accessories 2015-05
12 24 00 Window Shades 2015-05
12 24 21 Lightproof Shades 2015-05
12 31 00 Manufactured Metal Casework 2015-05
12 32 00 Manufactured Wood Casework 2015-05
12 34 00 Manufactured Plastic Casework 2015-05
12 35 70.21 Medication Cabinet  
12 36 00 Countertops 2013-06
12 56 70.11 Suspended Table  
 

Division 13 - Special Construction
NumberTitleChange Summary
13 05 41 Seismic Restraint Requirements for Non-Structural Components 2014-01
13 17 23 Therapeutic Pools 2015-05
13 17 23.11 Therapeutic Pool Accessories 2015-05
13 19 13 Kennel Enclosures and Gates  
13 21 29 Constant Temperature Rooms  
13 34 19 Metal Building Systems 2013-01
13 49 00 Radiation Protection  
 

Division 14 - Conveying Equipment
NumberTitleChange Summary
14 12 11 Electric Dumbwaiter Geared Traction and Winding Drum  
14 21 00 Electric Traction Elevators  
14 21 11 Traction Cartlift  
14 24 00 Hydraulic Elevators  
14 24 11 Hydraulic Cartlift  
14 91 33 Laundry and Linen Chutes  
14 91 82 Trash Chutes  
 

Division 21 - Fire Suppression
NumberTitleChange Summary
21 08 00 Commissioning of Fire Suppression Systems 2015-05
21 12 00 Fire-Suppression Standpipes 2015-06
21 13 13 Wet-Pipe Sprinkler Systems 2015-06
21 13 16 Dry-Pipe Sprinkler Systems 2015-01
21 22 00 Clean Agent Fire Suppression Systems 2015-05
21 30 13 Electric-Driven, Fire Pumps 2015-05
21 30 16 Diesel-Driven, Fire Pumps 2015-05
 

Division 22 - Plumbing
NumberTitleChange Summary
22 05 11 Common Work Results for Plumbing 2014-07
22 05 12 General Motor Requirements for Plumbing Equipment 2014-07
22 05 19 Meters and Gages for Plumbing Piping 2014-07
22 05 23 General-Duty Valves for Plumbing Piping 2014-07
22 05 33 Heat Tracing for Plumbing Piping 2014-07
22 07 11 Plumbing Insulation  
22 08 00 Commissioning of Plumbing Systems 2013-06
22 11 00 Facility Water Distribution 2014-01
22 11 23 Domestic Water Pumps 2014-01
22 12 16 Facility Elevated, Potable-Water Storage Tanks 2014-01
22 13 00 Facility Sanitary and Vent Piping 2014-07
22 13 23 Sanitary Waste Interceptors 2014-07
22 13 29 Sanitary Sewerage Pumps 2014-07
22 13 29.13 Wet Pit Mounted, Vertical Sewerage Pumps 2014-07
22 13 33 Packaged, Submersible Sewerage Pump Units 2014-07
22 14 00 Facility Storm Drainage  
22 14 29 Sump Pumps  
22 14 33 Packaged, Pedestal Drainage Pump Units  
22 14 36 Packaged, Submersible, Drainage Pump Units  
22 15 00 General Service Compressed-Air Systems 2014-07
22 31 11 Water Softeners 2014-01
22 33 00 Electric Domestic Water Heaters 2014-07
22 34 00 Fuel-Fired Domestic Water Heaters 2014-07
22 35 00 Domestic Water Heat Exchangers 2014-07
22 40 00 Plumbing Fixtures 2014-01
22 42 26 Commercial Disposers  
22 61 13.74 Dental Compressed-Air Piping 2014-07
22 61 19.74 Dental Compressed-Air Equipment 2014-07
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities  
22 62 19.74 Dental Vacuum and Evacuation Equipment  
22 63 00 Gas Systems for Laboratory and Healthcare Facilities  
22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities 2014-10
22 67 19.16 Reverse-Osmosis Water Equipment  
22 67 21 Water Dealkalizing System  
 

Division 23 - Heating, Ventilating, and Air Conditioning
NumberTitleChange Summary
23 05 10 Common Work Results for Boiler Plant and Steam Generation 2015-02
23 05 11 Common Work Results for HVAC 2015-02
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 2015-02
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 2015-02
23 05 51 Noise and Vibration Control for Boiler Plant 2015-02
23 05 93 Testing, Adjusting, and Balancing for HVAC 2015-02
23 07 11 HVAC and Boiler Plant Insulation 2015-02
23 08 00 Commissioning of HVAC Systems 2013-06
23 08 11 Demonstrations and Tests for Boiler Plant 2015-02
23 09 11 Instrumentation and Control for Boiler Plant 2015-02
23 09 23 Direct-Digital Control System for HVAC  
23 10 00 Facility Fuel Systems 2015-02
23 11 23 Facility Natural-Gas Piping 2015-02
23 21 11 Boiler Plant Piping Systems 2015-02
23 21 13 Hydronic Piping  
23 21 23 Hydronic Pumps 2015-02
23 22 13 Steam and Condensate Heating Piping 2015-02
23 22 23 Steam Condensate Pumps 2015-02
23 23 00 Refrigerant Piping 2015-02
23 25 00 HVAC Water Treatment 2015-02
23 31 00 HVAC Ducts and Casings 2013-03
23 34 00 HVAC Fans 2015-02
23 36 00 Air Terminal Units 2015-02
23 37 00 Air Outlets and Inlets 2015-02
23 38 13 Commercial-Kitchen Hoods  
23 40 00 HVAC Air Cleaning Devices  
23 50 11 Boiler Plant Mechanical Equipment  
23 51 00 Breechings, Chimneys, and Stacks  
23 52 25 Low-Pressure Water Heating Boilers  
23 52 33 Water-Tube Boilers 2015-02
23 52 39 Fire-Tube Boilers 2015-02
23 56 00 Solar Energy Heating System  
23 57 33 Geothermal Energy - Direct Use (Heating Applications)  
23 64 00 Packaged Water Chillers  
23 65 00 Cooling Towers 2015-02
23 72 00 Air-to-Air Energy Recovery Equipment  
23 73 00 Indoor Central-Station Air-Handling Units  
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units  
23 81 00 Decentralized Unitary HVAC Equipment  
23 81 23 Computer-Room Air-Conditioners  
23 81 43 Air-Source Unitary Heat Pumps  
23 81 46 Water-Source Unitary Heat Pumps  
23 81 49 Ground-Source Heat Pumps  
23 82 00 Convection Heating and Cooling Units  
23 82 16 Air Coils  
23 84 00 Humidity Control Equipment  
 

Division 25 - Integrated Automation
NumberTitleChange Summary
25 10 10 Advanced Utility Metering System  
 

Division 26 - Electrical
NumberTitleChange Summary
26 05 11 Requirements for Electrical Installations 2015-07
26 05 13 Medium-Voltage Cables 2012-12
26 05 19 Low-Voltage Electrical Power Conductors and Cables 2013-07
26 05 26 Grounding and Bonding for Electrical Systems 2012-12
26 05 33 Raceway and Boxes for Electrical Systems 2014-05
26 05 36 Wireways for Radiology Equipment 2014-05
26 05 39 Underfloor Raceways for Electrical Systems 2014-08
26 05 41 Underground Electrical Construction 2012-12
26 05 73 Overcurrent Protective Device Coordination Study 2012-12
26 08 00 Commissioning of Electrical Systems 2013-06
26 09 23 Lighting Controls 2014-05
26 11 16 Secondary Unit Substations 2012-12
26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 2012-12
26 13 13 Medium-Voltage Circuit Breaker Switchgear 2012-12
26 13 16 Medium-Voltage Fusible Interrupter Switches 2012-12
26 20 11 Isolated Power Systems 2015-07
26 22 00 Low-Voltage Transformers 2014-08
26 23 00 Low-Voltage Switchgear 2012-12
26 23 13 Generator Paralleling Controls 2012-12
26 24 13 Distribution Switchboards 2014-08
26 24 16 Panelboards 2014-05
26 24 19 Motor-Control Centers 2014-08
26 25 11 Busways 2012-12
26 26 00 Power Distribution Units for Static Uninterruptible Power System 2014-08
26 27 26 Wiring Devices 2014-08
26 29 11 Motor Controllers 2014-08
26 29 21 Enclosed Switches and Circuit Breakers 2012-12
26 32 13 Engine Generators 2015-07
26 33 53 Static Uninterruptible Power Supply 2012-12
26 35 26 Harmonic Filters 2014-08
26 36 23 Automatic Transfer Switches 2012-12
26 41 00 Facility Lightning Protection 2012-12
26 42 00 Cathodic Protection 2012-12
26 43 13 Surge Protective Devices 2012-12
26 51 00 Interior Lighting 2014-08
26 55 71 Medical and Surgical Lighting Fixtures 2014-11
26 56 00 Exterior Lighting 2014-05
 

Division 27 - Communications
NumberTitleChange Summary
27 05 11 Requirements for Communications Installations 2015-06
27 05 26 Grounding and Bonding for Communications Systems 2015-06
27 05 33 Raceways and Boxes for Communications Systems 2015-06
27 05 61 Leased Space Communications Equipment and Systems 2015-06
27 08 00 Commissioning of Communications Systems 2015-06
27 10 00 Structured Cabling 2015-06
27 11 00 Communications Equipment Room Fittings 2015-06
27 15 00 Communications Horizontal Cabling 2015-06
27 31 00 Voice Communications Switching and Routing Equipment 2015-06
27 31 31 Voice Communications Switching and Routing Equipment - Extension 2015-06
27 32 41 Two-Way Radio Equipment and Systems 2013-06
27 41 31 Master Antenna Television Equipment and Systems 2015-06
27 51 16 Public Address and Mass Notification Systems 2013-06
27 51 23 Intercommunications and Program Systems 2015-06
27 52 23 Nurse Call and Code Blue Systems 2013-06
27 52 31 Security Emergency Call, Duress Alarm, and Telecommunications 2013-06
27 52 41 Miscellaneous Medical Systems 2015-06
27 53 19 Distributed Radio Antenna (Within Building) Equipment and System  
 

Division 28 - Electronic Safety and Security
NumberTitleChange Summary
28 05 00 Common Work Results for Electronic Safety and Security  
28 05 13 Conductors and Cables for Electronic Safety and Security  
28 05 26 Grounding and Bonding for Electronic Safety and Security  
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security  
28 08 00 Commissioning of Electronic Safety and Security Systems 2013-06
28 13 00 Physical Access Control System  
28 13 16 Physical Access Control System and Database Management  
28 13 53 Security Access Detection  
28 16 00 Intrusion Detection System  
28 23 00 Video Surveillance  
28 26 00 Electronic Personal Protection System  
28 31 00 Fire Detection and Alarm  
28 52 31 Emergency Call System 2015-06
 

Division 31 - Earthwork
NumberTitleChange Summary
31 20 00 Earthwork  
31 20 11 Earthwork (Short Form)  
31 23 19 Dewatering  
31 23 23.33 Flowable Fill  
31 32 23 Pressure Grouting Soil Stabilization  
31 62 00 Driven Piles  
31 63 16 Auger Cast Grout Piles  
31 63 26 Drilled Caissons  
 

Division 32 - Exterior Improvements
NumberTitleChange Summary
32 05 23 Cement and Concrete for Exterior Improvements 2013-05
32 12 16 Asphalt Paving  
32 14 16 Brick Unit Paving  
32 17 23 Pavement Markings  
32 31 13 Chain Link Fences and Gates 2013-05
32 31 53 Perimeter Security Fences and Gates 2013-05
32 84 00 Planting Irrigation  
32 90 00 Planting  
 

Division 33 - Utilities
NumberTitleChange Summary
33 08 00 Commissioning of Site Utility Systems 2013-06
33 10 00 Water Utilities 2014-01
33 30 00 Sanitary Sewer Utilities  
33 40 00 Storm Sewer Utilities  
33 46 13 Foundation Drainage  
33 51 00 Natural-Gas Distribution  
33 63 00 Steam Energy Distribution  
 

Division 34 - Transportation
NumberTitleChange Summary
34 71 13 Vehicle Barriers 2013-05
34 75 13.13 Active Vehicle Barriers 2013-05
 

Division 48 - Electrical Power Generation
NumberTitleChange Summary
48 14 00 Solar Energy Electrical Power Generation System  
48 15 00 Wind Energy Electrical Power Generation System  
48 16 23 Geothermal Energy - Electricity Generation System  

All specifications are in Microsoft Word unless otherwise indicated.  All sections have dual Metric/English units.  Download all sections in compressed file (>15MB).

The previous Master Construction Specifications MasterFormat 1995 (MF95) are available on our FTP site for historical reference only and will not be updated.